Government Construction Claims Experts

This post provides a summary of some of Holloway Consulting’s government construction contract disputes experience. Some cases are discussed at our Government Construction Contract Disputes site

Government Construction Claims Experts

U.S. Postal Service Facility (TMS), Nashville, Tennessee

This case involved a dispute between the general contractor and subcontractor over the scope and cost of a postal facility mail conveyor system. The conveyor system consisting of a small-scale train designed and manufactured by Siemens consists of a tug approximately the size of a tabletop television, with a series of tilting tray cars trailing behind it. Our client received a judgement fro all incurred costs based on a Cardinal Change argument.

Biblioteca Latinoamericana, San Jose Branch Library

This involved a dispute between the City of San Jose and the general contractor over retainage claims and the cost of construction defect repairs.

Military Air Base Reconstruction, Post Desert Storm, Kuwait

This involved a dispute between the contractor and the Corps of Engineers over airbase restoration delays and costs.

Hoover Dam Visitors Center and Parking Structure

Holloway worked on behalf of the GC against the Bureau of Reclamation. The primary issue was the cumulative affects of scope changes and schedule delays on project costs.

Strategic Petroleum Reserve, DOE, Louisiana and Texas

Use this Search Engine to find the terms and information you need at our site.

And, the right side bar of each page here contains many related articles and posts.

The Holloway Consulting Group, LLC
Construction Managers, Consultants and Experts
12081 W. Alameda Pkwy., #450
Lakewood, CO 80228-2701
Denver Phone: (303) 984-1941
International : (888) 545-0666
Fax: (303) 716-0432

Email: steve.holloway@disputesinconstruction.com
Blog: disputesinconstruction.com
Web: hcgexperts.com

_________________________________________

See Related Selected Pages at our site disputesinconstruction.com (2-12-12)

Comments are closed.