A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

Power Generation Facility Construction Experts

Some of Holloway Consulting’s co-generation, fossil fuel and nuclear power facility projects to be addressed here and others at our blog Power Generation Facility Disputes:

Heat Recovery Steam Generators (FOSSIL FUEL)

COMBINED CYCLE CO-GENERATION; NEW JERSEY

Holloway was retained to represent the mechanical contractor in its $11 million pass-thru claim against the turnkey EPC contractor, on a combined cycle power cogeneration facility. Holloway performed technical, delay and labor productivity analyses, and testified in arbitration on various issues relating to entitlement, causation and damages. The panel awarded our client its entire field cost overrun of $8.5 million, plus legal expenses.

COMBINED CYCLE CO-GENERATION; CONNECTICUT

Holloway was retained by the owner/developer to assist in defending claims made by the general contractor in litigation. Holloway performed issue, delay and labor productivity analyses, and testified in deposition on various issues relating to entitlement, causation and damages. The case was settled for a small fraction of claimed damages.

COMBINED CYCLE CO-GENERATION; WV

Holloway was retained by the HRSG equipment supplier/general contractor to assist in the defense of $3 million in claims advanced by the mechanical contractor. Holloway performed issue, delay and labor productivity analyses, and participated in mediation of various issues relating to entitlement, causation and damages. The case was settled for a small fraction of claimed damages.

CONDENSER TUBE REPLACEMENT; TENNESSEE

Holloway was retained by the condenser tube replacement contractor to assist in the preparation of a lost labor productivity claim against the owner. Our client achieved a favorable settlement.

NOX SCRUBBER UNIT; TENNESSEE

Holloway was retained by a mechanical contractor to evaluate cost overruns and schedule delays experienced on an NOX scrubber retrofit project for a large coal fired power plant. The scope of work included bid estimate, change order, incurred cost and cost variance analyses; schedule delay analysis, labor productivity analysis and preparation of contractor affirmative claims.

PERRY NUCLEAR POWER STATION

GRAND GULF NUCLEAR POWER STATION

Use this Search Engine to find the terms and information you need at our site.

And, the right side bar of each page here contains many related articles and posts.

The Holloway Consulting Group, LLC
Construction Managers, Consultants and Experts
12081 W. Alameda Pkwy., #450
Lakewood, CO 80228-2701
Denver Phone: (303) 984-1941
International : (888) 545-0666
Fax: (303) 716-0432

Email: steve.holloway@disputesinconstruction.com
Blog: disputesinconstruction.com
Web: hcgexperts.com

_________________________________________

See Related Selected Pages at our site disputesinconstruction.com (2-12-12)

Comments are closed.